Breaking in ruby/diamond orfice on fusion

This procedure is to prevent the damage of the ruby or the diamond when installing a new one

Scan to Read on Device:

Turn out the flow controls counterclockwise until they stop

Cut pressure (Top knob)

Pierce (Bottom knob)

Run the machine to a spot on the table where there is no stone Start the hyd pump , Lower the nozzle, Start intensifier, Increase the pressure using the piercing knob (see pic), Open the water

Increase pressure on this gauge to 10 thou by turning the piercing flow control clockwise

Open and close the water button 3-4 times, Then increase the pressure by 10 thou until you get to your piercing pressure, Turn in the cut pressure to 10 thou and repeat the procedure above until you are at 60 thou psi