Breaking in ruby/diamond orfice on fusion

Guide Number: SG1230 | Printer Friendly Version | View Safety Disclaimer

This procedure is to prevent the damage of the ruby or the diamond when installing a new one

Turn out the flow controls counterclockwise until they stop

Cut pressure (Top knob)

Pierce (Bottom knob)

Run the machine to a spot on the table where there is no stone Start the hyd pump , Lower the nozzle, Start intensifier, Increase the pressure using the piercing knob (see pic), Open the water

Increase pressure on this gauge to 10 thou by turning the piercing flow control clockwise

Open and close the water button 3-4 times, Then increase the pressure by 10 thou until you get to your piercing pressure, Turn in the cut pressure to 10 thou and repeat the procedure above until you are at 60 thou psi

Last updated: November 30, 2020

Need Some Help?

Contact Park Industries® Customer Service
800-785-3391customerservice@parkindustries.com

ATTENTION

Prior to beginning installation, operation, or maintenance, you are advised to carefully read ALL instruction manuals and ALL safety materials and procedures provided with your equipment.

You are solely liable for the proper operation and maintenance of the equipment.

Park Industries® is not responsible for and expressly disclaims liability for any injuries (including death) or damage to the equipment or any other property as a result of improper operation or maintenance of the equipment, as well as failure to comply with the procedures set forth in the equipment’s instructional manual or any other safety materials and procedures. If you encounter any problems or difficulties, you are strongly encouraged to seek professional assistance.

Safety is our number one concern. Should you have any questions don’t hesitate to call our service team at 800-785-3391.