(17) Results

Digital Multimeters Recall

  • Safety Recall
  • Service

Fluke Corporation has identified a safety issue affecting certain Amprobe brand AM-500 and AM-510 Digital Multimeters, when used in CAT III electrical installations above 400 volts. (MEASUREMENT CATEGORY (CAT) III is applicable to test and measuring circuits suitable for connection to the distribution part of a building’s low-voltage mains installation.) As a precautionary measure, Fluke […]

Low Water Flow Alarm-Video

  • Service

Video shows how to clean the sensor for the low flow alarms. Alarm: 1006, 1005, 700232, 700233, Recycled, Fresh, Spindle Ring Water Feed Low, Spindle Center water Feed Low, Fresh Water Low Flow, Recycled Water Low Flow, Insufficient Water Flow

Stagger Settings and Tooling | Tip of the Week

  • Service

Tips on setting staggers for your FASTBACK II or FASTBACK machine as well as tooling maintenance. TIP OF THE WEEK Park Industries® Stone Fabricators Join our Customer Facebook Group! Where Park Industries® customers and operators can connect, network, and grow. Park Industries® Facebook Group is the place to discuss, share knowledge, and ask questions on […]

FASTBACK II Manual

  • Manuals

The operation and maintenance manual for the FASTBACK II Edge Polisher from Park Industries®.

Maintenance, Kits, & More | Tip Of The Week

  • Service

Members from our service team speak to: What we are doing concerning COVID-19, maintenance tips on multiple machines, and new parts kits available. TIP OF THE WEEK Park Industries® Stone Fabricators Join our Customer Facebook Group! Where Park Industries® customers and operators can connect, network, and grow. Park Industries® Facebook Group is the place to […]

Operating the SlabBack

  • Machine Operation

This video gives detailed instruction on operating the Park Industries SlabBack. Slab attachment for Park Industries FastBack. Finish and Polish the edge of granite, or stone slabs. Flat profile, with a chamfer or beveled edges.

conveyor belt installation

  • Service

This document illustrates the steps necessary to properly install a new conveyor belt on a Park Industries Fastback machine. skill level Estimated Time to complete: 3 – 4 hours Before installing the replacement belt, remove it from the box for a few hours prior to installation and lay it in the sun if possible. This […]

Spindle Motor replacement

  • Service

This document illustrates the steps necessary to properly replace a spindle motor on a Park Industries Fastback machine. Skill level 2 estimated time to complete: 30 minutes Power down the machine at the wall. Follow your companies internal lockout/tagout procedures. Open the junction box on the motor, make sure to label the wires then disconnect […]

Conveyor calibration

  • Service

This procedure will ensure that the distance the belt travels is accurate and will cause the machine staggers to act in a proper manner. Skill Level Estimated time to complete: 15 minutes