• Content Type

  • Reset Filters

(391) Results

Miter Gear Rack and Gear Replacement

  • Service

This procedure will assist in replacing the miter gear rack and gear on Pro Edge and Tru Edge polishing machines. Miter to 0 degrees and follow your companies LOCK OUT TAG OUT procedures. Start by removing the miter motor from the miter box. Remove the motor and set it on the ground. Measure the distance […]

Intensifier Repair Videos

  • Service

Predictive pump Breakdown High pressure seals and poppet This video shows how to replace the seals inside the high pressure cylinder on the intensifier. Also shows low pressure poppet and check valve servicing. The above video will show details that are broken down in seperate videos below. It was created by Hypertherm previously known as […]

Denison card tuning

  • Service

This procedure will assist in adjusting or setting up a new or current Denison Hydraulic Controller. Skill Level estimated time to complete: 1 – 1 1/2 hours If your cross travel is not stopping in a consistent location, check the following. Make sure the limit flag maintains a constant distance from t he cross travel […]

Pro Edge II, III, IV Spindle Overload Tripping

  • Service

This document illustrates the steps required to troubleshoot the possible causes of the overload(s) tripping for the spindle motor in the main electrical panel causing an alarm on the screen. WHILE PERFORMING THIS PROCEDURE ENSURE ALL LOCK OUT / TAG OUT POLICIES IMPLEMENTED BY YOUR COMPANY ARE FOLLOWED CLOSELY. Skill Level Estimated time to complete: […]

Page 17 of 33