• Content Type

  • Reset Filters

(146) Results

Cleaning ITM Optics

  • Service

This guide will show you how to clean the ITM optics. You will need to do this if the beam is not a nice “solid” beam. You will need the following items: cleaning kit and tools without liquids part# 70002811

Titan Draw Bar Removal & Replacement-Video

  • Service

Video shows how to remove and install new drawbar on Titan 2K, 3K and 4k models. Once you finish replacing the drawbar on the spindle, you will need to also complete the spindle orientation. Spindle Orientation Video

Rebuild VEM Water Union

  • Service

Guide will show you how to rebuild the water union step by step along with a video for demonstration purposes. Tools you will need:

ITM R-VALUES SPREADSHEET AND SETUP SHEETS

  • Machine Operation
  • Service

This document supplies the Titan operator with the R-Values spreadsheet used in training at Park Industries, and the associated setup sheets used to enter the data to the Titan. Also most common issues with measuring tools that may cause an error during measuring. Spreadsheet to store tool R Values 3000 and 4000 series Titan 2000 […]

Alphacam Missing machine tabs

  • Programming
  • Software Support

This will show you how to re-populate the Park Industries Tool Bars in Alphacam. This typically happens after a Windows update has been installed. Alphacam version 2021 and older Uncheck the 1_PIToolbars option and click OK. Alphacam version 2022 and newer Click Miscellaneous Tab and then uncheck 1_PIToolbars.

SL Laser Easy Sync and cable

How to setup the Easy Sync and communication cable to properly communicate from the IPC to the SL Laser. Install the included Driver CD before you plug in the USB device. SL Teacher will show a new COM port on Tab 9. After teaching the SL LASER, change to COM port setting in the AutoSL.txt […]

Water Union Replacement

  • Service

This guide will show how to replace the water union for the TITAN 2K & 3K series. lift cylinder straight up to remove, use caution so not to disturb draw bar sensor water union has reverse threads!

Spindle reset-video

  • Service

This guide will walk you through what you will need to do to reset your spindle and make sure it is in good operating condition. Use this video for Titan 1K and 2K models Use this video for 3K and 4K models.

Destiny XE/titan overhead laser calibration

  • Service

A step by step procedure to calibrate the SL Laser to a Destiny or Titan Router table Power up the Destiny XE / Titan and start the Front end software. When everything is up and running press the Set-up button on the main page. Inside the Set-up Page press the ‘Advanced Setup’ button. Enter the […]

Ball Screw Replacement

  • Service

This guide will demonstrate how to replace your ball screw on Titan and Fusion machines. The ball screw is what the Z axis travels on to move up and down. FOR YOUR SAFETY: You Must do the following to keep the rise and fall from sliding off of the rails during the next steps Do […]

Micro PC Restore – restoring disk image

  • Service

This document illustrates the steps required to restore a disk image or system backup on a Siemens Micro PC. This procedure can be used when setting up a new PC or to overwrite corrupted files on an existing PC. Restoring a disk image will erase all of the data on the micropc and replace it […]

Page 9 of 13